Are the boards on the production line still scheduled to be shipped? Or is a design change being considered now? From all the discussion I see, it looks like the later.
2 Likes
Are the boards on the production line still scheduled to be shipped? Or is a design change being considered now? From all the discussion I see, it looks like the later.